Airace FX6i GNSS RTK Receiver in the field

Airace FX6i

The Next Generation GNSS Receiver:
Accuracy and Reliability

OVERVIEW

The FX6i advantage.

Compact size and lightweight

465 g with a 119.5 × 138.5 × 138.5 mm footprint — highly portable for long survey days.

High-precision positioning

RTK accuracy of H: 6 mm + 0.5 ppm / V: 10 mm + 1 ppm, with 1040+ channels and up to 100 km RTK & PPK baseline.

Anyone on the team can use RTK

5-second startup, Bluetooth 5.0 pairing, and an intuitive Airace One workflow — no specialist training required.

EASY SETUP

Up and running in minutes.

Pair over Bluetooth 5.0, configure NTRIP, and start collecting with a 5-second RTK startup.

bluetooth

01

Pair

Enable Bluetooth & connect to the Airace One app

settings

02

Configure

Enter your NTRIP credentials or set as a base station

location_on

03

Survey

Collect points with RTK fix in 5 seconds

FIELD TO OFFICE

Airace One in the field. OneHub in the office.

Capture RTK points on your phone with Airace One — stakeout, collect, and export to CSV, DXF, KML, and Shapefile.

Sync to OneHub for live field tracking, import/export, surface analysis, and project delivery from one cloud console.

Airace OneHub project dashboard
Airace One mobile survey app

HARDWARE DESIGN

Engineered for endurance.
Built for the field.

The Airace FX6i is designed to eliminate physical fatigue without sacrificing an ounce of reliability. By packing industry-leading performance into an ultra-compact frame, it shifts the burden away from the surveyor.

Portability

An exceptionally small footprint makes it effortless to carry and handle all day on a rover pole.

Weatherproof & Sealed

Completely dustproof and heavily water-resistant to survive sudden downpours and harsh outdoor environments.

Environmental Resilience

Thermally protected and shock-tested to handle extreme temperatures, active job site drops, and rough handling.

Airace FX6i compact rugged design

TILT COMPENSATION

Smart Tilt Correction. Still Accurate.

The device features a built-in smart leveling system that automatically corrects for pole tilt. This allows you to capture highly reliable points even if your measurement pole is not held perfectly straight. By removing the need to constantly check a physical bubble level, it heavily speeds up your workflow in the field.

ALL-DAY POWER

24 hours RTK. Zero compromise.

15 hr base mode · fully charged in < 4 hr via USB Type-C

24 hr

RTK rover operation

10,000 mAh

Li-Ion battery (included)

2,000+

charge cycles

What Our Users Say

★★★★★

Highly accurate

The Airace FX6i GNSS Receiver offers millimeter level precision that has greatly enhanced our surveying capabilities. The accuracy and reliability of this product have significantly improved our workflow efficiency.

Not sure which receiver fits your workflow?

Compare all Airace receiversarrow_forward

SPECIFICATIONS

Product Specification

Download Full Spec Sheet (PDF) →

Receiver

Signal Tracking
GPS (L1 C/A, L2, L2C, L2E, L2P, L5), GLONASS (L1, L2, L3 C/A, L2P, L3), BeiDou (B1, B2, B2a, B2b, B3), Galileo (E1, E5a, E5b, E5ab, E6), SBAS (WAAS, EGNOS, BDSBAS, MSAS, GAGAN, SDCM), QZSS (L1C/A, L1C, L5, L2C, L6), NavIC (L5, L-Band)
Channels
1040+
Update Rate
Up to 20 Hz
Memory
32 GB
RTK & PPK Baseline
Up to 100 km
PPP Positioning
Any point on Earth
IMU Positioning
9 DOF, calibration-free (0°–60° tilt compensation in RTK mode) ± mm + 0.4 mm/°
Laser Positioning
—

Physical

Dimensions
119.5 mm (H) × 138.5 mm (W) × 138.5 mm (L)
Weight
465 g
OLED Display
Yes
Operating Temperature
-40 °C to +65 °C
Storage Temperature
-40 °C to +85 °C
Water/Dust Proof
IP67 (waterproof and dustproof)
Humidity
5% to 95% non-condensing
Dust Test Compliance
IEC-60529
Water Intrusion Test Compliance
IEC-60529
Vibration/Shock Compliance
MIL-STD-810F
Testing Lab
NABL accredited

Data Format

RTCM 2.x
RTCM 3.0
RTCM 3.1
RTCM 3.2
VRS
NTRIP
NMEA 0183
LLH/XYZ
RINEX
NMEA

Communication

Bluetooth
Bluetooth 5.0
Wi-Fi
2.4 GHz, 802.11 b/g/n
Network Communication
4G via certified Android controller (TDD-LTE/FDD-LTE/WCDMA/GPRS/GSM 900 & 1800 MHz, WCDMA 2100/900 MHz, LTE bands 1, 3, 7, 8, 20)
USB Type C
Charging & data transfer
NMEA Output
NMEA-0183 over Bluetooth
Startup Time
5 seconds
Internal UHF
1W
Radio Range
Up to 5 km

Power

Battery
10,000 mAh Li-Ion (included)
Operating Period
24 hr (Rover) / 15 hr (Base)
Charging Time
< 4 hr

Positioning Performance

High Precision Static
H: 3 mm + 0.1 ppm / V: 3.5 mm + 0.4 ppm
Fast Static/PPK
H: 3 mm + 0.5 ppm / V: 5 mm + 0.5 ppm
RTK
H: 6 mm + 0.5 ppm / V: 10 mm + 1 ppm
Tilt
RTK + 5 mm + 0.4 mm/° (up to 60°) RMS
RTK-Network/CORS
H: 6 mm + 0.5 ppm / V: 10 mm + 1 ppm
PPP
4 cm + 1 ppm or better with Network RT (H + V)
Laser RTK
—
DGPS Accuracy
H: 25 cm + 1 ppm / V: 40 cm + 1 ppm RMS; SBAS typically < 2 m 3DRMS

FAQ

Frequently asked questions

The Airace FX6i delivers RTK accuracy of H: 6 mm + 0.5 ppm / V: 10 mm + 1 ppm. High-precision static mode reaches H: 3 mm + 0.1 ppm / V: 3.5 mm + 0.4 ppm.
Request a Quote

Start the conversation

Tell us about your project, our precision specialists will respond within one business day.